William Wade Crisp, CIPE, CPD

William Wade Crisp, CIPE, CPD

 

Distinguishing Qualifications:

• 1991 - ASPE – Charter Member – American Society of Plumbing Engineers
• 1995-96 and 1996/97 – President of Palmetto State Chapter of ASPE-Chartered New Columbia Chapter
• 1998 to 2006 – Serving on the Society’s Membership Committee
• ASHRAE – American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
• OSHA 10 – June 1999, 2011 & February 2018
        -- Occupational Safety and Health Training Course in Construction Safety and Health
• 1974 - Mechanical Engineering –ASME- Greenville Technical College - Greenville, South Carolina
• 1978 – Broker and Realtor Licenses for South Carolina - Light Industrial, Commercial and Residential.
• 1992 – (CIPE)(CPD) International Certification in Plumbing Engineering
• Fluor Daniel - Most Valuable Person Award - Biogen, Inc. BPMF Project
• Merck and Co. - Stonewall Safety Award -No Lost Time Injury for 591.6 k Total Man Hours

 

Relevant Experience:
 

MHE Coordinator, Blue Rock Construction, Inc Amazon – Amberjack JFK8 Project - Staten Island, NY
A 2.4m Sq Ft Amazon Fulfillment Centre Interface and coordination of Amazon’s Material Handling Equipment Contractors with BRCI for the Core and TI buildouts. Responsible for the coordination and supervision of the BMS, Site Security, and Telecom contractor’s systems installation and initiated start-up/commissioning. Coordination of the mechanical and associated electrical systems for commissioning agent to complete systems close-out.

PM / Owner’s Representative - Systems Set to Work/Start-Up Coordinator, Amec Foster Wheeler Baxter Bioscience – Program Covington

Responsible for the coordination, the technical scope and the implementation of Utility, HVAC and MEP Systems Set to Work/Start-Up activities. Assist with the development of SOPs between the CM, Baxter, Engineering and AE Team, assist in the coordination of utility activation from CUB/ Spine, coordinate all BAS and PCS required interface and participate in formal Set to Work/Start-Up activities within the 180,000 SF pharmaceutical manufacturing facility.

Client Liaison – MEP Construction Manager, CRBB Biogen Idec – Research Triangle Park - P7 Purification Suite and P2 Viral Segregation Projects

Building 25 - Build-out support basis are for the 15,000L & 3,750L scale Gerber “clipped” process and the secondary 3,750L scale BIIB platform products. This process consists of chromatography, viral filtration, and UF/DF operations. Modifications and equipment installation are limited to the Spring 2015 Shut Down related activities with the intent that final fit-ups can be completed without impact to ongoing operations during a future, non-shutdown period.

Client Liaison/Senior Project Manager, AZ Corporation Chobani Greek Yogurt. Producer and Manufacturing of Greek Yogurt. South Edmeston Facility, New Berlin, New York.

New installation for (3) Filler Rooms, (1) Fruit Room; Packaging Line with Conveyors; Chiller Tunnel Upgrades; Maintenance Shop, Lab, Offices and Sleeving Office Additions; Ammonia Systems Consolidation and Waste Disposal/Extruder Project Development. Inclusive of all areas and divisions for the Trojan Horse, Epeius and Odyssey Projects. Daily Interface with the GPM, Plant Mgr, and COO.

Client Liaison/PCM, EAD Constructors, Inc. Cargill Inc.
Produces and markets food, agricultural, financial, and industrial products, and services. +/- $43.4 million – Blair, Ne-Clearwater Polyols Project Expansion – Cargill’s Zerose™ Erythritol Product Line Expansion (17mt/yr to 31.5 mt/yr) (Truvia) Management inclusive of all areas and divisions for the Construction Activities of the Clearwater Project.

Client Liaison/Project Manager Services, Merial Limited Merial Limited – Animal Health Company - Pharmaceuticals
Project execution plans, cost and schedules; construction and engineering evaluations; engineering/design specifications; construction schedules and budgets. Athens Site - Sept 2011 Bldg 1 and 4 Shut Down – Serving as Projects Coordinator +$0.2m Athens QC Lab Expansion Project +$1.1m BSL2 Research Facility Expansion – Colbert Research Center +$2.1 m BSL2/3 Research Development Laboratory / Phase II Colbert Research Center +$6.7m Analytical Research Laboratory Expansion – North Brunswick, NJ +$3.6m Greenfield - Bldg No 35 – Colbert Research Center +$1.5m Greenfield - SPF Hatch and Hold Facility – Colbert Research Center +$1.2m Waste Water Treatment Upgrade –Colbert Research Center +$0.8m Central Services Bldg – Boiler, Chiller and CT Upgrade +$0.7m Clean Steam Piping System – Piping System to Labs and Validation +$15m Filling Freeze Dryer/3CC Capping – Project Punch List and Closeout +$5.3m Greenfield - BSL-2/3 Research Development Laboratory/Phase I.

Project Manager, GS Tech Services Synsil Project, Chester, SC
$50million Silica Processing Plant. Responsible for the Arch, Plumbing and Facility Features.

 

 

Full Resume listed on the previous page

 